← Back to JIELINK EDM Masters

P-WIRE Case Studies

Real customer tests. Real data. No marketing fluff — just verified performance comparison results from production EDM shops.

✅ Verified by independent customer testing — same machine, same workpiece, same parameters
47% faster

Mitsubishi MV2400S — 227 min → 154 min

73 minutes saved per job. Zero wire breakage on 60mm thick SKD11 workpiece. Same machine, same parameters, same shift.

Mitsubishi MVSKD11 60mm0.25mm Wire
31% faster

MP1200 — 271 min → 207 min

64 minutes saved per job. Consistent performance across multiple shifts. Customer switched from standard brass wire after testing.

MP1200Production0.25mm Wire

Want to Add Your Own Data Point?

Run a P-WIRE trial on your machine. Send us your before/after numbers and get featured in our case study library.

Start Your Performance Trial →